INTEX-B/IMPEX
Intercontinental Chemical Transport Experiment Phase B
Primary Image
Location
Northwest U.S.
Duration
Apr 17, 2006 - May 15, 2006
Facility or Instrument
Main content
INTEX-B was conducted during a 10-week period from March 1 to May 15, 2006. The first phase of the study was performed during March with a focus on Mexico City pollution outflow, while the second phase was be performed during April and May with focus on Asian pollution outflow.